HDPE geomembrane, geotextile, GCL, drainage and waterproofing for mining, landfill, road and water projects — with the test reports your engineer asks for.
Six families, one mill. Custom width and roll length on every line.
HDPE liner for containment
Used for: Landfill, tailings, ponds, reservoirs, wastewater
Separation, filtration, drainage, reinforcement
Used for: Road, rail, drainage, embankment, slope works
GCL — sodium bentonite barrier
Used for: Landfill, canal, lagoon, mining containment
Two functions in one roll
Used for: Canal, tunnel, landfill drainage
Tunnel and underground
Used for: Tunnel, basement, retaining wall
Slope and channel protection
Used for: Channel, embankment, restoration
Photographed in production and at loading. Roll width, roll length and packing are agreed per order.
Our landfill liner is made to CJ/T 234-2006, which is equivalent to US GRI-GM13 — so the specification maps onto the ASTM language already in your design.
| Property (HDPE, 1.5 mm) | Value | Why it matters |
|---|---|---|
| Tensile yield | ≥22 N/mm | Resists installation damage |
| Tensile break | ≥40 N/mm | Survives differential settlement |
| Elongation at break | ≥700% | Stretches over uneven subgrade |
| Tear resistance | ≥190 N | Tears do not run |
| Puncture resistance | ≥480 N | Stones and rubble do not perforate |
| Carbon black | 2.0–3.0% | UV protection in exposed service |
| OIT | ≥100 min | Oxidation life in the ground |
Textured and column-point HDPE, GCL and drainage geonet. Heat, UV and steep slopes.
Smooth HDPE 1.5 mm, GCL and drainage geonet. Leachate containment and gas venting.
Filament, PP needle-punched and hot-rolled geotextile. Separation, filtration, subgrade reinforcement.
Smooth HDPE 1.0–2.0 mm for reservoirs and process ponds in evaporative climates.
HDPE liner 0.75–1.5 mm. Water saving and a clean pond bottom.
EVA waterproof plate and drainage plate. Waterproofing plus drainage behind the lining.
Technical data sheet for the exact grade and thickness supplied.
Batch certificate: density, tensile, tear, puncture, carbon black, OIT.
Every roll with batch number, matched to the packing list.
Container count calculated before freight is quoted.
Three things is enough for a specification recommendation and a price — usually within 48 hours.